Monday, March 2, 2015

A Doors Jam - Day 126

The natural progression for March 2nd, Day 126 was to have the doors installed and lo and behold... it was a regular Doors Jam at Project 713. By the time I arrived after work, the carpenter had installed all of the doors on the second floor and was putting in the last few doors on the first floor. The picture below is on the second floor landing. The double door on the right is the hall linen closet. The one on the left is to the master bedroom.
The next picture is the pocket door leading into the master bathroom. 
The pictures below are in Grace's bedroom. The first one shows her door from the hallway and immediately behind it is the pocket door that leads into her walk-in closet.
The picture below is the door into Grace's bathroom.
This next picture is in the guest bedroom, so you're seeing the bathroom door on the left and the closet door on the right.
The picture below is to the laundry room on the second floor.
The remaining doors were either installed after I left or will be put in tomorrow. After that, the carpenter will start installing the trim and molding.
Later,
Flip